5.10.2008

Front Door Missing

In order to pour the Veneziana flooring, the beautiful red front door was removed -- not sure where it is or when it will return. The Veneziana is doing fine -- we learned today that it is periodically saturated in water during this 30 day "drying" period. Hmmm. . . .again, we didn't quite get it. I think that it is a 30 day "setting" period.


No comments: